The IBIZA HAVEN Villa in highlands
All villas are build on a ideally oriented and located plot on the front line of the 50000 m2 crystal lagune and sandy beach of the luxury gated community of Highlands and have a maximum of 654 square meter distributed over 2 levels of 327m2 each.
The villa's are custom designed by EllaLifestyledesign.com


The building plot
On a plot 'Manzana 8, lote 8 of 793,89 m2,
(marked in yellow on the photo) :
Total price turnkey including plot : 949000 USD.
The IBIZA HAVEN Villa
A bold statement of modern luxury, designed for those who live vibrantly.
Ibiza Haven is a masterpiece of contemporary architecture, reflecting the sleek, open-concept elegance of the Balearic Islands. This villa is designed for those who crave expansive indoor-outdoor living, panoramic terraces, and a resort-style infinity pool. Imagine stepping out of your garden to direct access to your private sandy beach along a stunning 50,000m² crystal lagoon. Tailor the design to your personal preferences, ensuring that every detail meets your vision.
Ibiza Haven is your gateway to a sophisticated, sun-soaked lifestyle with all the comforts you desire.


The IBIZA HAVEN Villa Floor plans
Total build : 492,36 m2
115,28 m2 covered terraces + 32,77 m2 open terraces
23,21 m2 infinity pool
1 double covered carport
Spacious garden with outdoor kitchen / BBQ area of 51,09 m2
Amazing double height open space dining room - salon of 101,44 m2
2 Master bedrooms with ensuite bathroom and dressing room of 42,33 m2
2 guest bedrooms each with ensuite bathroom of 27,37 m2 each
Separate space to be used as storage / washing room or converted a bedroom for house staff
Guest toilet
Custom designed kitchen and bathrooms
First floor extra salon, game room, man cave or office with adjacent large balcon


The IBIZA HAVEN Villa Photo gallery


















© 2025. All rights reserved.
Plan-IT E.A.S. Aqua Village, Laguna Blanca, M11, L23, Altos, Cordillera, Paraguay
info@plan-it.info